首 页
大学试题
CMS专题
工学
经济学
专升本
法学
教育学
历史学
更多分类
搜索
题库考试答案搜索网 > 题目详情
当前位置:
首页
>
Keeping the draft at or below the load line mark will insure that the vessel has adequate().
>
题目详情
问题题干
答案解析
相关问题
热门问题
最新问题
问题详情
Keeping the draft at or below the load line mark will insure that the vessel has adequate().
A、ballast
B、reserve buoyancy
C、displacement
D、rolling period
时间:2022-01-05 03:12
关键词:
船舶浮性资料
答案解析
B
相关问题
Don.t mention that at the beginning of the story, or it may ____ the shocking ending
Goods of an inflammable,explosive or dangerous nature to the shipment whereof the carrier,master or agent of the carrier,has not consented,with knowledge of their nature and character,may at any time before discharge,()at any place or destroyed or rendered innocuous by the carrier without compensation.
When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()
Where the contract is to insure the subject-matter at and from,or from one place to another or others,the policy is called a().
Data items are added or deleted from the list only at the top of the______.
最新问题
● Data items are added or deleted from the list only at the top of the (72) .(72)
If the state of the goods at the time they were handed over to the consignee has been the subjectof a joint survey or inspection by the parties,notice in writing()be given of loss or damage ascertained during such survey or inspection.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
The ship will be responsible for the cargo loaded or unloaded().
A ship is responsible for the cargo loaded or unloaded().
The ship will be responsible for the cargo loaded or unloaded().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Either you or the headmaster()the prizes to those gifted students at the meeting
Keeping the draft at or below the load line mark will insure that the vessel has adequate().
别人在看