In project management and systems engineering,()is a deliverable-oriented breakdown of a project into smaller components. It is a key project deliverable that organizes the team's work into manageable sections.
>
题目详情
问题题干
答案解析
相关问题
热门问题
最新问题
问题详情
In project management and systems engineering,()is a deliverable-oriented breakdown of a project into smaller components. It is a key project deliverable that organizes the team's work into manageable sections.
A、RBS
B、PBS
C、GBS
D、WBS
时间:2022-01-04 17:39
关键词:
答案解析
D
相关问题
Project schedule management is made up of six management processes including:activity definition, activity sequencing,( ) , and schedule control by order.
Your vessel is equipped with a fixed CO2 system and a fire main system. In the event of an electrical fire in the engine room what is the correct procedure for fighting the fire?()
Your vessel is equipped with a fixed C02 system and a fire main system. In the event of an electrical fire in the engine room what is the correct procedure for fighting the fire?().
●Managing risk and documenting them is very important in project planning process. You are in the process of defining key risks, including constraints and assumptions, and planned responses and contingencies. These details will be included in the (73).
Risk management allows the project manager and the project team not to( ).
最新问题
Risk management allows the project manager and the project team not to (71).
● Risk management allows the project manager and the project team not to(71).(71)
●A project manager is called to an informal meeting with the customer and a problem is raised. This problem has major implications for the project manager's company, but the customer wants to pursue a solution at the meeting.The project manager should (72) .(72)
There is () in any water cooling system for a diesel engine allowing for expansion and water make-up in the system as well as air vent and chemicals addition.
In project management and systems engineering,()is a deliverable-oriented breakdown of a project into smaller components. It is a key project deliverable that organizes the team's work into manageable sections.
Project Quality Management must address the management of the project and the(27)of the project. While Project Quality Management applies to all projects, regardless of the nature of their product, product quality measures and techniques are specific to the particular type of product produced by the project.
Project Quality Management must address the management of the project and the ( ) of the project. While Project Quality Management applies to all projects, regardless of the nature of their product, product quality measures and techniques are specific to the particular type of product produced by the project.
The Project Management Triangle is a model of the constraints of project management. These constraints have been listed scope (or quality), ( ), and cost
(75)is primarily concerned with defining and controlling what is and is not included in the project.