A、transport tubulars from the pipe racks to the derrick floor
B、maintain constant tension on the marine riser
C、store and secure the excess drill line
D、lower and hoist the drill string into and out of the drilled hole
A、transport tubulars from the pipe racks to the derrick floor
B、maintain constant tension on the marine riser
C、store and secure the excess drill line
D、lower and hoist the drill string into and out of the drilled hole
时间:2022-01-03 20:37 关键词: 船舶结构基本知识
相关问题