The ratio of the work done by the machine______________the work done on it is called the efficiency of the machine.
>
题目详情
问题题干
答案解析
相关问题
热门问题
最新问题
问题详情
The ratio of the work done by the machine______________the work done on it is called the efficiency of the machine.
A、against
B、with
C、to
D、for
时间:2022-01-03 03:12
关键词:
英语三级
外语考试
答案解析
C
【答案】C【译文】机器所做的工作与在机器上所用的功之比,就称为机器的效率。 【考点】固定搭配 【解析】题中rati0与介词t0是固定搭配,the ratio of A to B的意思为“A与B之比(率)”,故选c。
相关问题
__________ is the act performed by or resulting from saying something; it is the consequence of, or the change brought about by the utterance.
A vessel restricted by its ability to manoeuver by the nature of its work or its deep draft is().
Goods of an inflammable,explosive or dangerous nature to the shipment whereof the carrier,master or agent of the carrier,has not consented,with knowledge of their nature and character,may at any time before discharge,()at any place or destroyed or rendered innocuous by the carrier without compensation.
Inquiries()the condition of the patients may be made personally or by telephone.
The ratio of the work done by the machine()the work done on it is called the efficiency of the machine.
最新问题
The ratio of the work done by the machine______________the work done on it is called the efficiency of the machine.
According to the customs of this port,the work of opening and closing hatch covers is done by ().
If the state of the goods at the time they were handed over to the consignee has been the subjectof a joint survey or inspection by the parties,notice in writing()be given of loss or damage ascertained during such survey or inspection.
()means any person by whom or in whose name or on whose behalf a contract of carriage of goods by sea has been concluded with a carrier,or any person by whom or in whose name or on whose behalf the goods are actually delivered to the carrier in relation to the contract of carriage of goods by sea.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
The court may reduce or deny remuneration if it appears that the salvors have by their fault ()or have been guilty of theft,receiving stolen goods,or other acts of fraud.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The extended aeration process consists of () the liquor either by bubbling air through it or by agitating the surface.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
A project life cycle is a collection of generally sequential project (73) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic (74) for managing the project, regardless of the specific work involved.