首 页
大学试题
CMS专题
工学
经济学
专升本
法学
教育学
历史学
更多分类
搜索
题库考试答案搜索网 > 题目详情
当前位置:
首页
>
The work is proceeding quite satisfactorily; indeed, we are ahead of _____.( )
>
题目详情
问题题干
答案解析
相关问题
热门问题
最新问题
问题详情
The work is proceeding quite satisfactorily; indeed, we are ahead of _____.( )
A、chart
B、timetable
C、schedule
D、list
时间:2021-09-01 22:53
关键词:
青书学堂
河南工业大学
学位英语考试辅导课程
答案解析
C
相关问题
_____ed ucation is the instruction that occurs when the instructor and studen t s are separated by distance or time,or both.
__________ is the act performed by or resulting from saying something; it is the consequence of, or the change brought about by the utterance.
1_____education is the instruction that occurs when the instructor and students are separated by distance or time,or both
()is the budgeted amount for the work actually completed on the schedule activity or WBS component during a given time period.
()is the budgeted amount for the work actually completed on the schedule activity or WBS component during a giving time period.
最新问题
When the Pilot is embarked he or she ().
When the pilot is embarked he or she().
A vessel restricted by its ability to manoeuver by the nature of its work or its deep draft is().
Where the contract is to insure the subject-matter at and from,or from one place to another or others,the policy is called a().
In the afternoon he often removes rust or()some paint work.
The quantity or condition which is measured and controlled is known as the ()
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
别人在看