The dataflow diagram is a graphical chart that depicts the flow of data among internal process, external entities, and data stores.
>
题目详情
问题题干
答案解析
相关问题
热门问题
最新问题
问题详情
The dataflow diagram is a graphical chart that depicts the flow of data among internal process, external entities, and data stores.
、错
、对
时间:2021-07-17 19:34
关键词:
答案解析
对
相关问题
The candidate should dress in a manner that is appropriate to the position ________ he is applying.
A collection of related data that is the electronic equivalent of a file cabinet.
The dataflow diagram is a graphical chart that depicts the flow of data among internal process, external entities, and data stores.
The path that a vessel is expected to follow,represented on a chart by a line drawn from the point of departure to the point of arrival,is the().
A chart has extensive corrections to be made to it. When these are made and the chart is again printed,the chart issue is a ().
最新问题
(1) is a method of constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the dependencies.This method includes following types of dependencies or precedence relationships: (2) the initiation of the successor activity, depends upon the completion ofthe predecessor activity.(3) the initiation ofthe successor activity, depends upon the initiation ofthe predecessor activity.空白(1)处填()
______: A graphical bar with buttons that perform. some of the most common commands.
A graphical bar With buttons that perform. some of the most common commands.
:A graphical bar with buttons that perform. some of the most common commands.
is a method used in Critical Path Methodology for constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the logical relationships that exist between them.
( )is a method used in Critical Path Methodology for constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the logical relationships that exist between them.
● (73) is a method used in Critical Path Methodology for constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the logical relationships that exist betweenthem.(73)
The Frame Relay network in the diagram is not functioning properly. What is the cause of the problem?()
A time diagram is a diagram on the plane of the().
A graphics card has been added and the system rebooted. When running the lsdev-Cc adapter, the graphics card is not listed in the output. Which of the following actions should be performed?()